Date of Establishment
16.09.2021
License Capacity
13,6 MWe
31.12.2025 Current Installed Capacity
13,6 MWe
Fuel Amount
120.000 Tons/Year Forest and Agricultural Waste
- Fuel Control and Reception Unit — Scales
- Fuel storage area (Closed storage)
- Fuel supply unit
- Grate Type Boiler and ancillary equipment
- Steam turbine and ancillary equipment unit
- Generator and Power Electronics (Domestic Parts)
- Diesel generator
- MV Cell and MCC
- Control systems room
- Transformer and power transmission lines
- Demineralized water production plant and laboratory
- Fire system
- Cooling Tower (WCT)
- Bottom and fly ash silo
- The administrative building consists of a warehouse, dining hall and workshops.